We implemented multiple sustainability initiatives in our manufacturing facilities, such as building a new underground waste water treatment plant, converting to natural gas boilers, energy-saving T5 lighting and non-CFC air conditioning, and solar panels for outdoor lighting.
Our new Australian plant was also designed with environmental considerations in mind, with 400 photovoltaic solar panels generating 100 kW of renewable energy, a third of total peak demand. Mangrove plantations were also arranged for in Bangpoo, Thailand.